06.03.08

Cracking under pressure (or not)

Posted in Around campus, Events, Follow-up, Front page, Pictures, Student work, news at 4:36 pm by Eric

bridges.jpg

Chemeketa’s transfer engineering program held its annual bridge competition earlier today. Students worked on the weight-bearing structures for much of the term before subjecting them to the weight test.

The structures had a to have a span of 14 inches, a maximum height of 7 inches and max weight of 2.5 oz.

Kyle Bonnet, Jonathan Boyd and James Lofton won the competition. Their 2.16 oz. bridge held a whopping 942 pounds, or 6,978 times it’s own weight. They’re in the last picture of the photo gallery here.

Leave a Comment

Bad Behavior has blocked 103 access attempts in the last 7 days.

AWSOM Powered